
This project involves the seismic bracing system for the Jingshan Tea processing facility (Plot No. Yu Zheng Gong Chu [2024] 2), which has an annual production capacity of 140 tons. The project aims to ensure the seismic safety of electromechanical systems and the continuity of production for this specialized agricultural processing facility. The design strictly adheres to the *Code for Seismic Design of Building Mechanical and Electrical Engineering Systems* (GB 50981) and relevant standards for food processing plants, incorporating detailed seismic support designs for critical process piping (such as connections for fixation, fermentation, and drying equipment), water supply and drainage systems, ventilation and dust removal ductwork, electrical cable trays, and fire sprinkler systems. By utilizing high-performance seismic bracing products and professional installation techniques, the project ensures the structural stability and functional integrity of all pipelines and equipment during seismic events. This effectively prevents production interruptions, degradation of tea quality, and secondary safety incidents caused by facility damage, thereby providing a safe and reliable infrastructure foundation for the large-scale production of Jingshan tea and supporting the sustainable development of the regional agricultural economy.














