This project involved the comprehensive design and installation of seismic bracing systems for the MEP (Mechanical, Electrical, and Plumbing) installations in the logistics building of Yiwu Dongfang Medical Investment Management Co., Ltd. As a critical facility supporting the complex's overall operations, the seismic reliability of its intricate piping and conduit systems—including HVAC, fire sprinkler networks, plumbing, power supply, and low-voltage cable trays—was paramount. The project strictly adhered to the *Code for Seismic Design of Building Mechanical and Electrical Engineering Systems* (GB 50981-2014), employing systematic seismic analysis and layout planning to implement standardized reinforcement for all required piping and equipment. The objective was to effectively withstand seismic forces and prevent secondary hazards, thereby ensuring the continuity of the logistics building's core functions during a seismic event and providing a robust foundation for personnel evacuation and rapid post-earthquake operational recovery.