Public Buildings

Wuhu Yueguangnian Residential Complex Secondary Water Supply Pressurization Pipeline Project (Phase II)

Update:Jan 03,2026



This project involves the secondary water supply pressurization piping system (Phase II) for the Yueguangnian residential complex in Wuhu City. The core objective is to design and install comprehensive seismic reinforcement measures for the complex's newly constructed secondary water supply pressurization piping system, in strict accordance with mandatory national standards such as the *Code for Seismic Design of Building Mechanical and Electrical Engineering Systems* (GB50981-2014).


The project scope primarily encompasses the provision of customized seismic support system solutions—including detailed design, supply of supports, and professional installation and commissioning—for water supply mains, branch lines, and critical ancillary equipment (such as valves and fittings). All seismic supports and hangers will undergo rigorous structural analysis and selection based on seismic fortification intensity requirements to ensure stability and reliability. These measures are designed to effectively withstand seismic forces and prevent the piping system from detaching or rupturing due to seismic shaking, thereby safeguarding the safety of the residential complex's water supply lifeline during an earthquake, facilitating rapid post-earthquake recovery, and enhancing the overall disaster resilience of the residential project.